of a new gas pipeline which were being towed to Algeria to then be laid and the sections joined.
They are manufactured in sections by Subsea 7 at a facility at Wick in Scotland. each sections has air pumped and the ends capped so the sections float and they are then towed in a 'bundle' by a tug to their destination.
Looks as if the main tow line parted en route hence why several sections have been washed ashore.
Posted By: Kirrie, Aug 11, 13:09:43
Written & Designed By Ben Graves 1999-2024